Substation 110/6 kV and 110/6 kV power line of the 5th mining area. Industrial development of the Lisakovskoye deposit (areas No. 2, No. 3, No. 5).
Substation 110/6 kV and 110/6 kV power line of the 5th mining area. Industrial development of the Lisakovskoye deposit (areas No. 2, No. 3, No. 5).
2023, Kazakhstan
ArcelorMittal, Lisakovsky Branch of Orken LLP
Customer:
Project status:
completed
Design, delivery, installation, and commissioning works on a turnkey basis.